1. Data Centers Market Context
Data center electricity demand expected to double to 945 TWh by 2030 (IEA 2025), driven by AI. Hyperscalers (Google, Microsoft, Meta) have committed to 24/7 carbon-free by 2030, making solar + storage procurement mandatory.
2. Recommended Technology
- 1TOPCon 610-640W bifacial
- 2N-type high-efficiency
- 3Glass-glass (30-year warranty)
- 4Tracker-mounted utility scale
3. Key Design Considerations
⚠️ 24/7 carbon matching → solar + BESS + wind hybrid
⚠️ Site land constraints → maximize W/m² density (high-power modules preferred)
⚠️ Grid interconnect timeline (12-36 months in US)
⚠️ PPA structure: physical vs virtual
⚠️ Tier 1 modules only (operational risk > capex premium)