Italia vs Reino Unido: Comparación de Importación Solar 2026

Compare todos los aspectos de importar paneles solares a Italia y Reino Unido — aranceles, certificaciones, logística, dinámica de mercado.

💡 Resumen

Italia y Reino Unido ofrecen dinámicas de importación distintas. Revise las métricas abajo para elegir la estrategia correcta.

Métrica🌐 Italia
Europe (EU)
🌐 Reino Unido
Europe (non-EU)
Arancel de Importación0% (EU MFN)0% (UK Global Tariff)
AntidumpingNoneNone (UK terminated measures post-Brexit)
IVA22% standard; 10% on solar installations20% standard; 0% on residential battery+solar since April 2022 until March 2027
CBAM Aplica✅ Sí✅ Sí
Puertos PrincipalesGenoa, La Spezia, Livorno, NaplesFelixstowe, Southampton, London Gateway
Plazo Típico30-40 days sea freight from Shanghai28-35 days sea freight from Shanghai
Incoterms PreferidosCIF Genoa, DDP Milan/RomeCIF Felixstowe, DDP
Marcas PrincipalesJinkoSolar, LONGi, Trina Solar, FuturaSun (local), Canadian SolarJinkoSolar, LONGi, Trina Solar, JA Solar, Q CELLS
Potencia Popular430-500W mono (residential), 580-640W (utility/C&I)430-470W mono (residential dominates), 550-600W (C&I)
Precio Q1 2026Landed CIF Genoa TOPCon 580W: ~€0.09-0.10/W (Q1 2026). Superbonus 110% scaled down but still drives retrofit demand.Landed CIF Felixstowe TOPCon 580W: ~£0.08-0.10/W (Q1 2026). UK CBAM from 2027 — plan carbon reporting now.

Notas Regulatorias

🌐 Italia

Superbonus 110% tax deduction scheme (now scaled to 90%/70%) created massive residential PV boom. CEI 0-21 grid code compliance critical for inverters. CBAM applies (reporting since Oct 2023).

🌐 Reino Unido

Post-Brexit, UK has own tariff regime + UKCA marking (fully replacing CE by 2025). MCS certification essential for residential market (required for Smart Export Guarantee + zero-VAT). UK CBAM launching 2027.

🚢

JUST SOLAR — Entrega a Italia

JUST SOLAR supplies Italian distributors with CEI 0-21 compliant systems and full CBAM documentation.

Cotización para Italia
🚢

JUST SOLAR — Entrega a Reino Unido

JUST SOLAR ships CIF Felixstowe with UKCA documentation and MCS-eligible modules from Tier 1 factories.

Cotización para Reino Unido

🌍 ¿Abasteciendo ambos mercados?

JUST SOLAR GROUP entrega a más de 40 países con documentación localizada y condiciones flexibles.

Otras Comparaciones Populares